

Second, heart rate measurements were taken while working to get the value of Work Energy Cost and Total Energy Cost. The first, measurements of heart rate during the calibration step test and the values obtained Increase Ratio of Heart Rate and Work Energy Cost-step test.

In the measurement of operator CC 2TR taken four subjects, whereas operator CC 1TR taken two subjects. Measurements were done in CC 2TR and CC 1TR. In the workload analysis, for measurement by measuring heart rate during calibration step test and work. Based on the analysis known that to get the CR affected by materials and processes (manufacturing).

By using analysis of Toyota Business Practice found that the interior and electrical section is a major section of CR less with specification resin material for supplier Sugity. Toyota Business Practice used to analyze the Cost Reduction activities. Toyota Business Practice consists of 8 steps, there are problem clarification, breakdown analysis, target setting, root cause analysis, countermeasures, see countermeasures through, evaluation, Standardization. Toyota Business Practice is a way to apply the Toyota Way clearly at work everyday with the basic concept is a method to solve the problem. Please use this identifier to cite or link to this item:Īnalisis Beban Kerja pada Proses Pembuatan Crankcase dan Penerapan TBP untuk Memprediksi Cost Reduction di PT.
